Article 1
These Measures are formulated for the purpose of attracting foreign investment for the development and management of tracts of land (hereinafter referred to as "tract development") so as to intensify the construction of public works, improve the environment for investment,introduce foreign-invested technically advanced enterprises and export-oriented enterprises and develop the export-oriented economy.
Article 2
The term "tract development" as used in these Measures means that after obtaining the right to the use of state-owned land, the investors shall carry out, as planned, comprehensive development and construction on the land, including levelling the ground and constructing such public works as water supply and drainage systems, power and heat supply systems, roads and communications networks, and communications facilities, so that conditions shall be created for the land to be used for industrial or other construction purposes. The investor shall then transfer the right to the use of the land for operating public utilities, or proceed to construct such above-ground buildings as industrial houses and the supporting facilities for production and everyday life services and engage in the business activities of transferring or leasing these above-ground buildings.
Definite development targets shall be specified for tract development and there shall be definite construction projects that are intended to make use of the developed land.
Article 3
With respect to a project to attract foreign investment for tract development, the municipal or county people's government shall organize the drawing up of a tract development project proposal (or a feasibility study report, the same hereinafter).
With respect to a tract development project which is to make use of 1,000 mu or less of arable land or 2,000 mu or less of other land and whose amount of investment for comprehensive development falls within the limits of powers for examination and approval of the people's government of the province, autonomous region or municipality directly under the Central Government (including the people's government or administrative committee of a special economic zone, the same hereinafter), the project proposal shall be submitted to the people's government of the province, autonomous region or municipality directly under the Central Government for examination and approval.
With respect to a tract development project which is to make use of more than 1,000 mu of arable land or more than 2,000 mu of other land and whose amount of investment for comprehensive development exceeds the limits of powers for examination and approval of the people's government of the province, autonomous region or municipality directly under the Central Government, the project proposal shall be submitted, through the people's government of the province, autonomous region or municipality directly under the Central Government, to the State Planning Commission for examination, verification and overall balancing and then to the State Council of the People's Republic of China for examination and approval.
Article 4
Foreign investors who intend to invest for tract development shall, in accordance with the respective provisions of the Law of the People's Republic of China on Chinese-Foreign Equity Joint Ventures, the Law of the People's Republic of China on Chinese-Foreign Contractual Joint Ventures and the Law of the People's Republic of China on Foreign-Capital Enterprises, form a Chinese-foreign equity joint venture, or a Chinese-foreign contractual joint venture or a foreign-capital enterprise (hereinafter referred to as a "development enterprise") to engage in the development and management of the tract of land.
Development enterprises shall be governed and protected by the law of China and all their activities shall abide by the laws and regulations of the People's Republic of China. Development enterprises shall have the right to act on their own in business operations and management in accordance with the law, but they shall have no administrative power in their development areas. The relationship between a development enterprise and other enterprises shall be of a commercial nature.
The State encourages the state-owned enterprises to form development enterprises with foreign investors by using the right to the use of state-owned land as investment or condition of co-operation.
Article 5
Development enterprises shall obtain the right to the use of the state-owned land in their development areas in accordance with the Law.
In assigning the right to the use of State-owned land to a development enterprise, the people's government of the municipality or county where the development area is located shall, in accordance with the laws and administrative rules and regulations of the State on the administration of land, rationally specify the bounds of the tract of land, the purpose of its use, the term of assignment, the assignment fee and other conditions, sign a contract for assigning the State-owned land and submit it for approval in accordance with the limits of powers for examination and approval with respect to the assignment of the right to the use of State-owned land.
Article 6
After the right to the use of State-owned land has been assigned, the resources and objects buried thereunder shall continue to be owned by the State. If it is necessary to exploit and utilize them, the exploitation and utilization shall be administered in accordance with the pertinent laws and administrative rules and regulations of the State.
Article 7
A development enterprise shall draw up a tract development plan or a feasibility study report which shall specify the overall targets and respective targets for different stages, the specific details and requirements in the actual development, and the plan to utilize the developed land.
The tract development plan or feasibility study report shall, after examination and verification by the municipal or county people's government, be submitted to the people's government of the province, autonomous region or municipality directly under the Central Government for examination and approval. The examining and approving authorities shall organize the competent authorities concerned to provide co-ordination concerning the construction and management of the relevant public works.
Article 8
If the development area is within the limits of a planned urban area, the various items of development and construction shall be in conformity with the requirements of city planning and be submitted to the administration of the planning.
The various items of construction in a development area shall be in conformity with the laws, administrative rules and regulations and standards of the State concerning environmental protection.
Article 9
A development enterprise may transfer the right to the use of the state-owned land only after it has carried out the plan of tract development and satisfied all the conditions prescribed in the contract for assigning the right to the use of the state-owned land. No development enterprise that fails to invest for the development of the land in accordance with the conditions prescribed in the contract for assigning the right to the use of the state-owned land and the requirements of the plan for tract development may transfer the right to the use of the state-owned land.
The transfer or mortgage of the right to the use of state-owned land by development enterprises and other enterprises, and the termination of the right to the use of state-owned land shall be handled in accordance with the laws and administrative rules and regulations of the State on the administration of land.
Article 10
A development enterprise may attract investors to the development area to make investment, accept the transferred right to the use of state-owned land and launch enterprises. Enterprises with foreign investment shall be established in accordance with the respective provisions of the Law of the People's Republic of China on Chinese-Foreign Equity Joint Ventures, the Law of the People's Republic of China on Chinese-Foreign Contractual Joint Ventures and the Law of the People's Republic of China on Foreign-Capital Enterprises.
The launching of enterprises in the development areas shall be in conformity with the State policy concerning the investment in industries.
The State encourages the launching of technically advanced enterprises and export-oriented enterprises.
Article 11
The postal and communication undertakings in the development areas shall be placed under the unified planning, construction and management of the postal department. Or they may, with the approval of the province, autonomous region or municipality directly under the Central Government, be constructed with investment by a development enterprise; or the
development enterprise and the postal department may pool their investment for the construction of communications facilities, which, in either case, shall be transferred, after completion, to the postal department for operation, with financial compensation to be given to the development enterprise in accordance with the contract signed between the two parties.
Article 12
Development enterprises that invest in public utilities of their own such as power stations, heat stations and water plants within the development area may operate the business of power, water and heat supplies within the development area or hand them over to the local enterprises of public utilities for operation. If the capacity of the public utilities is in surplus, which renders it necessary to be supplied to places outside the development area or to be connected to a network outside the development area for operation, the development enterprise shall sign a contract with the local enterprises of public utilities in accordance with the pertinent
provisions of the State and operate in accordance with the conditions prescribed in the contract. If it is necessary for a development area to use water and power resources from outside, the business thereof shall be operated by the local enterprises of public utilities.
Article 13
If a development area covers a coastal port or bay, or a river port sector, the coastline or riverside line shall be placed under the unified planning and administration of the State. The development enterprise may construct and operate a special port area and wharf in accordance with the unified planning of the competent state communication authorities.
Article 14
No business activities or social activities that are banned by the laws and administrative rules and regulations of the State may be engaged within the development areas.
Article 15
If special administrative measures are required in respect of import and export administration and Customs administration for a development area which is mainly intended for the operation of export processing enterprises, these shall be submitted to the State Council of the People's
Republic of China for approval and specific measures of administration shall be formulated by the competent authorities of the State.
Article 16
The general administration, judicial administration, port administration and Customs administration in a development area shall be organized and exercised respectively by the competent authorities of the State, the people's government of the locality where the development area is situated, and the judicial organs that have jurisdiction.
Article 17
Tract development with investment by firms, enterprises and other economic organizations or individuals from the regions of Hong Kong, Macao and Taiwan shall be governed with reference to these Measures.
Article 18
These Measures shall be put into effect within the limits of the specific economic zones, the open coastal cities and the open coastal economic zones as of the date of promulgation.
杨春宝一级律师简介
杨春宝一级律师,大成上海高级合伙人、资本市场部主任、国资基金研究中心主任,大成中国区私募基金专业带头人、科技与文化法律研究中心联合牵头人。执业30余年,长期从事私募基金、投融资、并购重组法律服务,尤其对对赌研究颇深且具有非常丰富的实战经验,并专注于金融机构股权投资业务。2004年起多次入选The Legal 500"私募基金"和"公司与商业"等境内外各类律师榜单,代理的中国法院首例适用外国法律审理外国公司的董事损害小股东权益纠纷案入选上海高院发布的《上海法院域外法查明典型案例》和威科先行"要案头条"。入选上海涉外法律人才库、上海市司法局鼎新法治人才库、上海国有企业改制法律顾问团,具有上市公司独立董事任职资格,系多家知名高校的兼职教授或兼职研究生导师及上海市商务委跨国经营人才培训班讲师。出版《私募股权投资基金风险防控操作实务》等16本投融资法律专著。了解更多常见法律问题
外商投资成片开发土地需符合什么条件?
法律概念与规则解释:成片开发是指外国投资者在取得国有土地使用权后,按照事先确定的规划目标,对土地进行综合性的开发建设。具体工作包括平整场地、建设供水排水系统、供电供热系统、道路交通和通信设施等公用工程,使土地具备工业或其他建设项目使用的基础条件。随后投资者可以转让土地使用权,也可以继续建设工业厂房及生产生活服务配套设施,并通过转让或出租这些地上建筑物获取收益。开发项目必须有明确的开发目标和具体的拟建设项目,不能盲目圈地或单纯囤积土地。案件事实与实务场景引用:依据该管理措施,外商投资成片开发必须通过设立中外合资经营企业、中外合作经营企业或外资企业(即发展企业)来实施。发展企业要遵守中国法律法规,享有依法自主经营管理的权利,但在其开发区域内不拥有行政管辖权,与区域内其他企业的关系属于商业性质,而非管理与被管理关系。国家鼓励国有企业以土地使用权作价入股或作为合作条件与外方组建开发企业。开发企业须按照法律规定的程序取得国有土地使用权,并与市、县政府签订土地出让合同,明确土地范围、用途、年限、出让金等条件。实务指引与风险提示:外资企业参与成片开发前,应重点核实项目是否符合当地土地利用总体规划和城市总体规划,并与地方政府充分沟通开发条件和公共设施配套责任。在签订土地出让合同时,应明确开发周期、投资强度、建设标准等具体指标,避免因未按合同约定完成开发投资而导致土地使用权无法转让或续期受到限制。同时,要注意开发区域内地下资源归国家所有,不得擅自开采。
外商投资成片开发项目的审批权限如何划分?
法律概念与规则解释:外商投资成片开发项目属于特定类型的土地开发活动,其立项审批实行分级管理。审批权限的核心划分依据是使用土地面积和投资规模两个要素:使用耕地面积在一千亩以内或使用其他土地面积在二千亩以内,并且综合开发投资金额在省级人民政府审批权限范围内的项目,由省级人民政府负责审批;如果使用耕地面积超过一千亩或使用其他土地超过二千亩,或者投资金额超过省级审批权限,则需经省级人民政府转报国家计划主管部门审核并综合平衡后,再上报国务院批准。案件事实与实务场景引用:市或县人民政府负责组织编制成片开发项目建议书或可行性研究报告,作为审批的基础文件。对于规模较大的项目,审批过程需要经过省级审查、国家计委审核平衡和国务院批准三个环节,体现出国家对大面积土地开发的严格控制。对于规模较小的项目,省级人民政府即可完成审批,效率相对较高。此外,开发企业制定的成片开发规划或可行性研究报告也需要经市县审核后报省级政府批准,并要求在规划中明确总体目标、分期目标、具体开发内容以及开发后土地的使用安排。实务指引与风险提示:外资企业投资前应准确认定项目用地面积和投资额度,判断适用的审批级别,避免因瞒报或拆分项目规避审批而引发后续法律风险。同时,要关注土地面积计算口径是耕地与其他土地的区别,以及项目是否位于城市规划区内,因为这直接影响规划审批和环保审查要求。建议在项目启动初期与市县自然资源和规划部门充分沟通,确认项目建议书的内容和审批路径,确保程序合法合规。
开发企业能否在取得土地后直接转让土地使用权?
法律概念与规则解释:根据该管理措施,开发企业获取国有土地使用权后,不能任意转让土地。转让的前提是必须按照土地出让合同约定的条件和成片开发规划的要求,完成实际开发投资,使土地达到可转让的状态。也就是说,只有完成场地平整和基础设施配套建设,形成工业用地或其他建设用地条件后,才可以进行土地使用权的转让。如果企业没有按照合同约定投入资金进行土地开发,或者没有按照开发规划执行,就不得转让土地使用权。这一规则的核心目的是防止炒卖土地和投机圈地,确保土地资源得到有效开发。案件事实与实务场景引用:开发企业在取得国有土地使用权后,需要编制详细的开发规划和可行性研究报告,明确总体目标和分期目标,以及开发后的利用计划。该报告须经市县审核后报省级政府批准。在实际操作中,开发企业通常先完成供水、排水、供电、供热、道路、通信等公用设施建设,再面向其他投资者招商,向其转让已经具备条件的土地使用权用以设立企业。转让或抵押土地使用权以及土地权利终止等事项,均须依照国家有关土地管理的法律规则办理。案件事实与实务场景引用:该管理措施还规定,对于以使用国有土地使用权作为投资或合作条件的国有企业,同样需要履行完成开发投资的义务。实务指引与风险提示:实践中常见的争议是企业为融资需要提前转让未达开发条件的土地使用权,此类交易因违反转让前置条件而可能被认定无效,双方都可能面临经济损失。因此,开发企业在签署土地出让合同时应合理规划开发周期,并将已完成的开发投入作为转让时的重要筹码。受让方则应在受让前核实土地是否已满足合同约定的投资强度和开发条件,必要时要求转让方提供开发投入的证明材料,以降低交易风险。